Insulating the concrete by using the cement materials
Preparation before starting the insulation :
• The concrete surface bust be rough so that the pores are open to ensure the penetration and sticking strength.
Work steps :
• Eliminating the weak concrete and the additional pumps , also the greens so that it reaches the solid concrete and to be processed by max plug substance or anything similar .
• Breaking and making an angle with depth of 3*3 cm at the point walls intersection with floors and to be processed by max plug or anything similar
• Painting the two layers perpendicular of the cement substance maxseil super or anything similar.
Note :
The weak concrete types need special injection works which is available at ALzamil company .
After insulation :
• Spreading for five days after finishing the execution and to increase the sticking and penetration.
• Casting concrete layer to protect the floors and not be scratched .
• Floors painting .
Important note :
The used cement substances will be supplied by Alzamil company from the best cement insulation manufacture in the words and the best quality .